background image

Fig. 3   Preparing the base

Fig. 4 IT - Fissaggio barriera

          EN - Fixing the barrier body

          DE - Die Festsetzung der Sperrkörper

          ES - Fijación barrera

 

     

FR - Fixation barrière

PT - Fixação barreira

PL - 

Mocowanie korpusu bariery    

Fig. 2     Typical Installation

ALT4

ALT6

Summary of Contents for BOOM GATE

Page 1: ...BOOM GATE Instructions and warnings for installation and use ...

Page 2: ...ct Introduction Technical characteristics Preliminary Checks Installing the Product Installing Release Adjustment of rod angle Inversion of direction of opening Balancing Testing and commissioning Testing Commissioning Instructions and warnings for TABLE OF CONTENTS ...

Page 3: ...d it must be replaced by the manufac turer or its after sales service or in all cases by a person with similar do not allow parts of the automation system to be immersed in water or other liquids During installation ensure that no liquids are able to enter the various devices should this occur disconnect the power supply immediately and contact a Key Automation Service Centre Use of the automation...

Page 4: ...barrier is well balanced and will therefore remain sta tionery when released in any position check that the electricity supply line to which the product is to be connected is suitably earthed and protected by an overload and dif ferential safety breaker device the system power supply line must include a circuit breaker device with a contact gap allowing complete disconnection in the condi ensure t...

Page 5: ...the allen wrench back to its original position and close the lock You can now restore the power supply and check that everything is working correctly Fasten the locking nut back in place 4 4 Changing the direction of opening ALT4 VERSION Turn off the power supply and with the manual manoeuvre place the rod vertical restore the transmission and remove the rod to pre vent hazardous conditions Open t...

Page 6: ...edule of the system Make sure the user understands proper automatic manual and emergency operation of the automation Inform the end user in writing of the dangers and risks still present 5 1 Testing All system components must be tested following the procedures outlined in the respective instruction manuals Check that they meet the guidelines in Chapter 1 Safety warnings Check that the gate or door...

Page 7: ...320 845 1110 900ALT624K 400 830 1188 280 900ALT242K 220 Fig 1 Dimensions IMAGES ...

Page 8: ...base Fig 4 IT Fissaggio barriera EN Fixing the barrier body DE Die Festsetzung der Sperrkörper ES Fijación barrera FR Fixation barrière PT Fixação barreira PL Mocowanie korpusu bariery Fig 2 Typical Installation ALT4 ALT6 ...

Page 9: ...Fig 6 Adjustment of rod angle Fig 5 Release Fig 7 Inversion of direction of opening and balancing ALT4 ALT6 ...

Page 10: ...Automation S r l Via A Volta 30 30020 Noventa di Piave VE T 39 0421 307 456 F 39 0421 656 98 info keyautomation it www keyautomation it Instruction version 580ISBR rev 01 580ISBR rev 03 Instruction version ...

Reviews: