3 Calibration
38
Series E4360 Service Guide
Current Programming and Measurement Calibration
Step 7. Connect the +sense terminal to the +output, and the -sense terminal to
the –output. Connect a precision shunt resistor to the output. The shunt
resistor should be able to measure at least 120% of the output’s rated
full-scale current. Connect the DMM across the shunt resistor.
Step 8. Select the first current calibration point.
Front Panel:
SCPI Command:
Select Next. The information field
should indicate: Enter P1 data
CAL:CURR:LEV P1
*OPC?
Step 9. Calculate the shunt current (I=V/R) and enter the data.
Front Panel:
SCPI Command:
Select the Measured Data field.
Enter the data from the external
DMM.
Press Select when done.
CAL:CURR <data>
Step 10. Select the second current calibration point.
Front Panel:
SCPI Command:
Select Next. The information field
should indicate: Enter P2 data
CAL:CURR:LEV P2
*OPC?
Step 11. Calculate the shunt current (I=V/R) and enter the data.
Front Panel:
SCPI Command:
Select the Measured Data field.
Enter the data from the external
DMM.
Press Select when done.
Press Next to finish calibration.
CAL:CURR <data>
Step 12. Select current protection calibration.
Front Panel:
SCPI Command:
Select OCP. Press Select when
done.
Press Next to finish calibration
CAL:CURR:PROT
*OPC?
Summary of Contents for E4360 Series
Page 1: ...Service Guide Keysight Technologies Series E4360 Modular Solar Array Simulator ...
Page 2: ......
Page 6: ......
Page 10: ......
Page 40: ......
Page 44: ...4 Disassembly 44 Series E4360 Service Guide ...
Page 64: ......
Page 72: ......