25/44
Scienlab Regenerative AC Emulator
–
Keysight SL1200A Series
–
Operating Instructions
Connection and Assembly 3
All essential connection points are located on or in the input and output
terminal box at the rear of the SL1200A Scienlab Regenerative AC Emula-
tor.
Figure 4: Connections of the input and output box
Before commissioning the SL1200A, the following assembly work must be
carried out:
Electrical installation,
DUT connection,
Connecting signal lines and control lines.
Electrical Installation
All cables must be selected according to the maximum current and country-spe-
cific standards.
Connecting the mains supply (input)
The description of connecting the mains supply is based on the standard
version with terminals. Establish the connection in accordance with the
pertinent standards and guidelines at the installation location and accord-
ing to the circuit diagram. Install supply lines and interfaces in the control
cabinet.
Prevent tripping hazards due to loosely installed cables.
Protect cable against damage.
The lines to the mains supply are routed via a terminal box (right-hand
side) on the rear of the SL1200A. A right-turning rotating field must be en-
sured for the order L1, L2, L3. Further electrical details are listed in the
To ensure that EMC limit values are adhered to, it is important that the shielding
of the EMC cable feedthrough fully surrounds the shielding of the cable.
NOTE
NOTE
Summary of Contents for SL1200A Series
Page 2: ......