26/44
Scienlab Regenerative AC Emulator
–
Keysight SL1200A Series
–
Operating Instructions
3 Connection and Assembly
EMC shield contact
•
Cables are routed underneath the terminal box through the
EMC screw connections into the system
•
Ensure full-surface contact of the (stripped) cable shielding
with the EMC contact ring
Mains supply connection LV (SL1201A
–
SL1203A)
•
Connection at the provided terminals according to the circuit
diagram
•
Ensure a right-turning rotating field for L1, L2, L3, N
•
Separate bolt for PE
•
Ring cable lug connections
•
Tightening torque: see circuit diagram
•
30 kVA/45 kVA systems: single feed-
through using a shared 5-wire cable
Mains supply connection HV (SL1212A, SL1213A)
•
Connection at the provided terminals according to the circuit
diagram
•
Ensure a right-turning rotating field for L1, L2, L3, N
•
Separate bolt for PE
•
Ring cable lug connections
•
Tightening torque: see circuit diagram
•
90 kVA systems: five feedthroughs for
single wires
To ensure contact protection and avoid electronic interference, the protective
screen must be refitted, and the terminal box door closed after installation of the
lines for mains supply.
Housing ground/functional earth
As an additional protective measure, an earth connection has been at-
tached to the SL1200A to reduce and systematically dissipate electromag-
netic/electrical interference.
Housing ground/functional earth
•
On the rear side of the system
•
Connection and coupling of housing ground
•
Connection for EMC-compliant design
Establish the connection in accordance with the pertinent standards and
guidelines at the installation location and according to the circuit diagram.
NOTE
NOTE
NOTE
Summary of Contents for SL1200A Series
Page 2: ......