35/44
Scienlab Regenerative AC Emulator
–
Keysight SL1200A Series
–
Operating Instructions
Commissioning 4
Initial commissioning
Checking the relevant components
For initial commissioning, the following components must be switched on
or enabled:
Fuses are switched on (behind the panel; ex works setting)
Service switch/circuit breaker is switched on (ex works setting)
Power stages are switched ON (ex works setting)
Emergency stop push button is released,
Emergency stop push button
•
On the front side
•
Press: forces local emergency stop of the system
(Responds: see safety relay)
•
Turn counter-clockwise: unlocks
Perform visual and functional check of additional safety equipment (see
Safety and Monitoring Equipment
External emergency off function is released, if applicable (pre-equipped
or if the external emergency off function is not used a jumper/bridge
must be established)
✓
The logic path of the SL1200A is active and communication with the
system is established.
Performing initial commissioning
The following activities must be carried out for initial commissioning:
1
Main switch should start in position 0 (OFF) (ex works setting)
2
Turn the main switch to position I (ON)
→ the system starts up
→
when the power stages are ready to use, the green light on the
power stages light up permanently
3
Release key switch set to ON (position right)
Key switch Test Release
•
On the front side
•
Used for enabling/disabling test
•
OFF: test release withdrawn (output contactors and
power stage are blocked)
•
ON: test release given, test may be started (e.g. acknowl-
edged by software)
4
External release function is released, if applicable (pre-equipped or if
the external release function is not used a jumper/bridge must be es-
tablished)
5
Download the control software SL1200A Regenerative AC Emulator
Soft Front Panel (SFP) and activate the software.