7 Servicing and Maintenance
Carrying out Maintenance Work
System maintenance should be carried out as follows:
1
Switch off system by using the main switch 0 (OFF),
2
Secure against being switched on again,
3
Open front panel and switch off service switch/circuit breaker,
4
Disconnect system from mains supply and communication,
5
Measure the voltage at the output and terminals to ensure that they
are de-energized,
6
Carry out maintenance in accordance with table or arranged mainte-
nance plan,
Maintenance
Test interval
Functional check of the emergency off device
Once a month
General visual check of the components and
wiring system
12 months after operational commissioning,
however, at the latest, 18 months after ex-
works calibration
Visual inspection and functional test of the safety
systems (see
Carry out calibration of the system and, if re-
quired, adjust the system
Table 1: Maintenance works
7
Switch on service switch/motor circuit breaker and close the front
panel,
8
Switch on the system at the main switch I (ON),
9
In the test operation, check the system is functioning properly,
10
If necessary, repair system or contact the local KeysightCare depart-
ment and check the functionality after completing the repair work.
Cleaning the system
Only use a dry, clean and lint-free cleaning cloth to clean the system.
Cleaning must be carried out as follows:
1
Switch off system by using the main switch 0 (OFF),
2
Disconnect system from mains supply and communication,
3
Measure the voltage at the output and terminals to ensure that they
are de-energized,
4
Wipe the housing, display modules and front panels with a dry, clean
and lint-free cleaning cloth.