MX3
Keywest Technology Information Systems
Keywest Technology
14563 W. 96
th
Terrace
Lenexa, Kansas 66215
800.331.2019
www.keywesttechnology.com
5
KWT TM 2-1-MX3MPOM
18 March 2005
Change 01
*12 VDC: St12 VDC input. Utilize only power supply provided with your unit.
Connect this only when you are ready to run the unit, as it is set to “auto-power” (safety against
power outages). As soon as you plug in the AC, the device will power-up, boot-up, and begin to
run stored Slides.
MX3 OPERATION
The MX3 player itself is a fire-and-forget device. Once you have made the appropriate
connections (be sure to connect a video connector to something) and powered up the unit, it will
begin to play any loaded slide-show.
You’ll also need a network connection to communicate with the device.
Should MX3 be shut down through normal Windows™ means, you’ll need to power the unit
with the front panel momentary power switch. To do so, simply press the round, black power
switch on the front-right side of the unit and release. You should hear the fans begin to run, and
LED indicators on the front panel should illuminate.
Out of the box, MX3 has sample slides and playlists installed and scheduled. These should
begin to run after the unit completes it’s boot cycle.
To control the operation of the MX3, follow the directions below and install the MX3 Media
Scheduler software on a computer of your choice, with the following pre-requisites:
--Pentium III 200 MHz Processor or greater with MMX support
--64 MB Ram
--100 MB HDD Space
--Network connection capable of reaching the MX3 (see IT if necessary)
***NOTE***
MX3 may take up to 60 seconds to completely boot up, load slides, and begin playing its
schedule. Please be patient during this process.