3
Pitching your tent/awning
1.
Unroll the tent/awning and peg the four corners
-
we recommend the use of a SPS Footprint to keep the bottom
of the tent/awning clean.
-
Pegging points may need adjusting/tightening once the tent/awning is erected.
3.
Assemble the pump and insert into rear valve
-
ensure the valve is in the closed position (see Fig 1.)
Inflate the tube to around 7psi **pressure in tube may need adjusting dependant on weather conditions
−
Hot weather will need less air/pressure
−
Colder/Windy weather you may need to increase the air/pressure to give more stability to the air frame
(in order to increase beyond the GREEN range on the gauge you will need to remove the black T SHAPE release valve
-
the
release valve prevents over inflation and by removing you must keep an eye on the current weather conditions and adjust
pressure accordingly to prevent damage to the air frame)
*Fig 1.
-
Valve position is changed with the white push button at the centre, there are two positions.
Closed/Inflate
-
button will be taller/proud of housing | Open/Deflate
-
button will be depressed/shorter
Pump Hose is a bayonet style connection and locks in place with a twist
4.
Prior to inflating the tent/awning, unzip a couple of doorways, this allows air to enter the inside whilst inflating
and prevents the unit acting like a vacuum, making the erection process easier.
Work your way forward inflating each tube.
2.
Prior to inflating the tent/awning, unzip a couple of doorways, this allows air to enter the inside whilst inflating
and prevents the unit acting like a vacuum, making the erection process easier.