2 x
Floor Joist 1-1/4 x 3 x 40-3/4”
Wood Parts
Hardware
060
8 x
#12 x2” Pan Screw
Step 6: Join Swing and Slide Wall Assemblies
Part 1
040
x 4 per board
A:
With at least two helpers lift the Slide Wall Assembly and Swing Wall Assembly so the (041) Narrow Back
Panel and (042) Narrow Front Panel meet with (052) Back Wall Panel and (051) Front Wall Panel and are tight
together as shown in fig. 6.1.
B:
Make sure the assembly is square then on the inside of the assembly, tight to (040) Slide End Panel and flush
to the bottom of the panels attach 1 (060) Floor Joist to (041) Narrow Back Panel and (052) Back Wall Panel
and a second (060) Floor Joist to (042) Narrow Front Panel and (051) Front Wall Panel with 4 (S7) #12 x 2” Pan
Screws per board. (fig. 6.1 and 6.2)
Swing Wall
Assembly
Slide Wall
Assembly
S7
041
042
051
052
Fig. 6.2
Fig. 6.1
Flush
Tight
(both sides)
060
S7
041
051
26
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...