C:
Measure the distance from the Back Wall to the Front Wall from the inside of the panels to make sure it
equals 35-3/4”. Maintain this measurement when installing the floor boards. Starting at the Slide Wall place 3
(070) Floor Boards tight to the previously attached (070) Floor Board, followed by 1 (072) Floor Board then 8
more (070) Floor Boards. Make sure all boards are equally spaced then attach to (071) Long Floor Joist and
each (061) Side Joist with 6 (S20) #8 x 1-3/8” Wood Screws per board. (fig. 7.4, 7.5 and 7.6)
Step 7: Floor Assembly
Part 2
Wood Parts
11 x
Floor Board 1 x 5 x 35-5/8”
1 x
Floor Board 1 x 4 x 35-5/8”
070
072
x 6 per
board
Fig. 7.4
Tight
Fig. 7.6
070
Slide Wall
Swing Wall
070
x 8
Hardware
72 x
#8 x 1-3/8” Wood Screw
S20
S20
061
070
072
Back Wall
Front Wall
Fig. 7.5
Back Wall
Front Wall
061
35-3/4”
070
072
071
061
061
31
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...