Step 21: Crowsnest Assembly
Part 4
4 x
#8 x 2” Wood Screw
S11
Hardware
E:
Place Upper Crowsnest Assembly from Step 20 in between (210) Crowsnest Bottom Sides so (202)
Crowsnest Front is flush to the bottom and front of each (210) Crowsnest Bottom Side and to the tops of (190)
Crowsnest Gussets and (191) Crowsnest Joists. Attach with 2 (S11) #8 x 2” Wood Screws per board. Screws go
into (202) Crowsnest Front and (204) Crowsnest Spacer. (fig. 21.7)
A
DWG. NO.
SIZE
WEIGHT:
Crowsnest ATF
SHEET 4 OF 6
REV.
SCALE:1:1
Flush
Fig. 21.7
S11
Flush
210
210
204
204
S11
Flush
202
61
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...