Step 21: Crowsnest Assembly
Part 5
F:
Attach (202) Crowsnest Front flush to the top of each (190) Crowsnest Gusset and each (191) Crowsnest
Joist with 8 (S4) #8 x 3” Wood Screws. (fig. 21.8)
G
: Place 1 (212) Crowsnest Side flush to the top and front of (200) Crowsnest Top make sure each board is level
then attach with 2 (S3) #8 x 2-1/2” Wood Screws per board. (fig. 21.8)
8 x
#8 x 3” Wood Screw
4 x
#8 x 2-1/2” Wood Screw
S4
Hardware
S4
x 8
Flush and
level
Flush and
level
200
212
212
Fig. 21.8
202
190
191
190
Flush
2 x
Crowsnest Side 3/4 x 3-1/4 x 14-3/4”
212
Wood Parts
S3
S3
S3
62
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...