A:
Lay down (220) Crowsnest Gap Board flush to front of (202) Crowsnest Front and (221) Crowsnest Floor
flush to back of (192) Crowsnest Back. In between the gap and floor boards place another (221) Crowsnest
Floor. (fig. 22.1)
B
: Attach the (221) Crowsnest Floor Boards with 8 (S20) #8 x 1-3/8” Wood Screws per board and the (220)
Crowsnest Gap Board with 6 (S20) #8 x 1-3/8” Wood Screws. (fig. 22.1)
Step 22: Crowsnest Floor Assembly
Hardware
1 x
Crowsnest Gap Board 1 x 6 x 29-3/8”
2 x
Crowsnest Floor 1 x 6 x 29-3/8”
220
Wood Parts
221
x 8 per
floor board
22 x
#8 x 1-3/8” Wood Screw
S20
Flush
Flush
Fig. 22.1
221
202
220
x 6
S20
S20
64
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...