Step 12: Floor Assembly cont.
Step 9b Floor Asy
D:
In between (A3) CE Gap Boards and (A8) Centre Board place 4 (A4) Floor Boards making sure all boards are
evenly spaced. Attach to (A15) Side Joist, (A16) Floor Joist and (A17) Floor Front using 5 (S2) #8 x 1-1/2” Wood
Screws per board. (fig. 12.4)
Fig. 12.4
A17
S2
A24
x 5
per
board
not shown
4 x
Floor Board 1 x 6 x 23-1/2”
Wood Parts
Hardware
20 x
#8 x 1-1/2” Wood Screw
S2
A4
A15
27
A4
A3
A8
A3