96
4 x Swing Bracket
Other Parts
Step 48: Install Swing Brackets
A:
From outside the tunnel assembly, measure 1-1/4” in from each end of the (6035) Tunnel Side Joists and
attach 4 Swing Brackets using 1 (G1) 5/16 x 1-1/2” Hex Bolt (with flat washer and lock washer) per bracket.
(fig. 48.1 and 48.2)
Hardware
A
5/16 x 1-1/2" Hex Bolt X4 (washer & loc washer)
leave 1-1/4" to end of board
1-1/4”
6035
Swing
Brackets
4 x
5/16 x 1-1/2” Hex Bolt
(5/16” lock washer, 5/16” flat washer)
G1
5/16” Lock Washer
5/16” Flat Washer
G1
Fig. 48.1
Fig. 48.2