PAS SERIES
Parallel and Series Operation 5-7
OVP (overvoltage protection) setting
OVP (overvoltage protection) is set on both master and slave units
according to "3.2.2 Setting the OVP (Overvoltage Protection) Trip
Point".
OVP is set to 1/2 the voltage to be protected on each unit.
However, set the OVP trip point of the slave unit slightly higher than
that of the master unit, so that the OVP function of the master unit is
activated first. Set the trip point before specifying units to operate in
slave mode through CONFIG settings.
OCP (overcurrent protection) setting
OCP (overcurrent protection) is set on both master and slave units
according to "3.2.3 Setting the OCP (Overcurrent Protection) Trip
Point".
Set the OCP trip point of the slave unit slightly higher than that of the
master unit, so that the OCP function of the master unit is activated
first.
5.1.5 Master-Slave Series Operation Procedure
• When turning on the POWER switch, be sure to turn on the
master unit first.
When turning off the POWER switch, be sure to turn on the
slave units first.
• If you don’t keep the procedure, erroneous operation may
result.
The switches on the slave units are disabled. OUTPUT on/off opera-
tion is performed on the master unit.
When you are done with the steps described in "5.1.4 Master-Slave
Series Operation Setup" normal operations are performed on the mas-
ter unit.
NOTE
Summary of Contents for PAS 10-105
Page 10: ...VIII PAS SERIES This page has been intentionally left blank ...
Page 54: ...3 22 Basic Operation PAS SERIES This page has been intentionally left blank ...
Page 78: ...4 24 Remote Control PAS SERIES This page has been intentionally left blank ...
Page 131: ...PAS SERIES Specifications 8 13 This page has been intentionally left blank ...
Page 137: ...PAS SERIES Specifications 8 19 This page has been intentionally left blank ...
Page 145: ......