Centauri Energy Server
–
User Manual Model Number -GF-80000-360Vdc-380Vac-3/3
This manual is subject to change without notice and at the sole discretion of Kilowatt Labs, Inc.
Kilowatt Labs, Inc. |
25
4 Storage and Installation of Energy Server:
4.1 Storage:
If the Energy Sever is not to be installed immediately, please do not remove the packing, and store the
Energy Sever vertically in a dry room facing towards sunshine according to the mark on the packing
box, and avoid dust and high temperature environment.
4.2 Installation Notices:
This section gives a general description of the requirements of the Energy Sever for the site selection
and wire layout of the Energy Sever.
•
The installation site must be provided with the professional engineers authorized by the company
for the guidance of installation.
•
Ground the Energy Sever properly and turn OFF all switches before making electrical connections.
•
The Energy Sever should be installed by qualified engineers according to the descriptions in this
section following the local standards.
•
When connecting the battery, the voltage at the battery terminal will be more than 360 VDC which
possesses the risk of the fatal danger.
→
Please take off rings, bracelets, watches or any other metal jewelry.
→
Use tools having insulated handle(s).
→
Please wear rubber gloves.
→
If there is leakage of the battery electrolyte or the battery is broken, please replace the battery
and put it in the container with the resistance to sulfate corrosion and dispose it according to
the local regulations.
→
When your skin contacts the electrolyte, please wash it with water immediately.