Centauri Energy Server
–
User Manual Model Number -GF-80000-360Vdc-380Vac-3/3
This manual is subject to change without notice and at the sole discretion of Kilowatt Labs, Inc.
Kilowatt Labs, Inc. |
30
with the separate
“
Circuit Breaker
”
or
“
Over-
current Protection Switch” in order to improve the
reliability of equipment.
•
The external power switch should be installed near the equipment so as to cut off the power
supply in the emergency situation.
4.9 Power Cable:
While choosing suitable external cables for connection, the following factors should be taken into
account:
i.
Current capacity of power cable
ii.
Requirements of the system overload capacity
iii.
The ambient temperature
iv.
Physical support media
The qualified installation engineers should select suitable cable for connection according to local
related standards and table 14. The length of the cables should be limited to 2-10 meters because too
long cable can lead to the low voltage otherwise, the cross-section area of the corresponding cable
should be increased.
Rated capacity
(kW)
Standards
80
AC input cable
Max. current (A)
250
Chinese Standard (mm
2
)
≥70
American Standard (AWG)
≥2/0
Bypass input cable
Max. current (A)
270
Chinese Standard (mm
2
)
70
American Standard (AWG)
≥2/0
Note!
There is the filter capacitor of the RFI filters to earth, which may generate some
leakage current, therefore the leakage protection switch should not be used for
the inverter power supply in this system in case of the false triggering protection
of the device.