3.6 Introduction of Breaker:
Signs
Name
Function
DC START
DC start switch
When the DC start breaker is
turned ON, the
Energy Server
performs the battery soft start.
MANUAL BYPASS
Manual bypass switch
This breaker is only operated by the
professional maintenance staff and
the load will be connected directly
to the bypass input by switching ON
this button.
OUTPUT
Output switch
Turning ON the output breaker will
make a connection between the
load and the system static switch.
BYPASS
Bypass switch
TURN ON the Bypass breaker to
switch ON the bypass AC input.
RECTIFIER
Rectifier switch
TURN ON the Rectifier breaker to
switch ON the rectifier AC input.
PV1#
PV 1# input switch
When the switch is enabled, the
system MPPT 1# will supply the
power.
PV2#
PV 2# input switch
When the switch is enabled, the
system MPPT 2# will supply the
power.
PV3#
PV 3# input switch
When the switch is enabled, the
system MPPT 3# will supply the
power.
PV4#
PV 4# input switch
When the switch is enabled, the
system MPPT 4# will supply the
power.
Table 10
Introduction of Breaker