Assembly Instructions
Footprint
®
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent.
If you have any questions concerning these instructions, please call Kimball Office Customer Service.
Part No. 1847185
Revision D-09
Page 1 of 2
Worksurface Cantilever Bracket
for Interworks
®
EQ Panel
Tools Required
■
Drill with Torque Option
■
Tape Measure
■
#R-2 Square Srewdriver Bit
■
Level
■
Rubber Mallet
Package Contents
■
#8 x .75 Robinson Head Flakeboard Screw
General Information
■
Cantilevers are required when placing two surfaces end to
end, when open kneespaces are greater than 48" for 1 3/16"
surfaces or 60" for 1 9/16" surfaces, or in configurations
where standard panel worksurface bracket support is not
possible. Cantilevers are designed so that a single bracket
can share the load between two adjacent surfaces. They
can be used as sole support for a worksurface. The top of
the cantilever should be located 24" from the bottom of
fabric for standard height (29" nominal). (Figure A).
Installation
1. Insert hook on the top of cantilever into the slot on panel
siderail at a 45˚ angle. (Figure B).
2. Push the top of the cantilever downward. (Figure C).
Important:
Use mallet to make sure bracket is seated and
fully engaged.
Figure A
Standard
Height
24"
45˚
Figure B
Figure C
1
2