Priority
TM
1
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent.
If you have any questions concerning these instructions, please call Kimball Office Customer Care.
2383873, Revision B
Assembly Instructions
Return, Extension and Bridge
for U-Leg and Open-Frame
Leg Assemblies, and T-Leg and
Post-Leg Bases
Tools Required
Hardware Required
5 MM Allen Wrench/Driver
Installation
M6 x 12 Socket Head Screw
Important:
- All fasteners using tapped holes should be started by hand to
prevent cross-threading.
- Begin the installation at the highest point of the floor, with
first Legs being set to standard 27 3/4” height, unless otherwise
specified. 8 MM Allen Wrench is used to make adjustment on
Legs with machine screw adjustment.
- Assemble Support Rails to appropriate Frame or Base at end
of Returns and Extensions prior to making connection to Main
Support Rail. (Figure B) See Assembly Instructions for U-Leg
and Open-Frames or T-Leg and Post-Leg Bases, 2383871 &
2383872.
- For Electric Height-Adjustable T-Leg and Post-Leg Bases see
Priority Assembly Instruction 2383883 for proper initialization.
- Bases are easiest to assemble when upside-down.
-
Worksurface installation is not complete until Flat Brackets
(ordered separately)
are installed. (See Tip 7)
Important assembly instructions, tips and figures shown on
next page.
Figure A
Guide Hole
For 36” Deep Main
Worksurface
For 30” Deep Main
Worksurface
For 24” Deep
Main Worksurface
For 36” Deep
Extension
Application
only
Notch
For 30” Deep Return,
Extension or Bridge
Worksurface
For 36” Deep Return,
Extension or Bridge
Worksurface
For 24” Deep Return,
Extension or Bridge
Worksurface
Guide Hole