8
Start-up the RO-Unit:
!
Before start-up check that all plumbing and wiring has been done in
accordance with all local rules and regulations.
Open the water shot-off valve.
Check that all water connections are tight.
Insert the main plug
Switch on the RO-unit with the toggle switch.
The “No Water Alarm” light flashes approx. 30 times and 3 horizontal lines appear in
the display.
After approx. 7 seconds, the high-pressure pump switches on in order to produce
permeate in the storage tank.
For venting the RO-unit, turn off the unit 3-4 times at the on/off switch.
The RO-unit is equipped with 3 level sensors. As soon as the midway level is
reached in the storage tank, the 3 horizontal lines start to flash.
Once the upper level is reached in the storage tank, the output in litres per hour ap-
pears at the display.
NOTE: If there is water used before it is finished, the display will still show the 3 hori-
zontal lines in the display. Because the count was interrupted.
Check the temperature of the raw water.