Operation Instruction
P-H-2
Press the 7 button – the memory location is flashing – using the 9 and 10 buttons set start of the
heater operating time. Day of the week is flashing- set the day of the week. By repeatedly
pressing the 6 button, memory locations 2 and 3 can be programmed or the time display mode
can be reached.
8.
Recalling/erasing preset times
Repeatedly press the 6 button until the desired memory location is displayed. To erase the
preset time, press the 7 button several times until the time of the day is displayed instead of the
memory.
9.
Programming duration of operating time The heater must be switched off. Press the 9
button for 3 seconds – operating time is flashing – and set the desired operating time (10 to 120
minutes) using the 9 and 10 buttons.
10.
Setting the remaining operating time
Set the desired remaining operating time (1 to 120 minutes) using the 9 and 10 buttons. The
remaining operating time refers to the time the heater still continues to remain in operation and
the ignition switched off.
11.
Setting the wakeup time
A wakeup time can only be programmed on the standard digital timer. The wakeup time is not
bound to a specific day of the week.
Repeatedly press the 7 button until the bell symbol
appears on the display. Set the
desired wakeup time using the 9 and 10 buttons. The alarm clock turns off after 5 minutes or
when one of the buttons is pressed.
12.
Recalling/erasing the wakeup time
Repeatedly press the 7 button until the bell symbol
appears on the display – read off
wakeup time. To erase the wakeup time: press the 7 button until the bell symbol
is no
longer visible on the display.
13.
remote control
Possible by means of an optional external “instant heating” button
14.
Vehicles with ADR equipment
On ADR vehicles it is not possible to program a preset starting time. The remaining time is
shown on the display while the heater is in operation. The clock can be set. The alarm clock
function can be programmed on the standard digital timer.
Summary of Contents for XMQ6127 series
Page 18: ...Operation Instruction CI 1 Figure 17 Set MotPPR Figure 18 Clear Trip A Figure 19 Clear Trip B...
Page 32: ...Operation Instruction P A 1 2 Control panel operation...
Page 33: ...Operation Instruction P A 1...
Page 34: ...Operation Instruction P A 1...
Page 35: ...Operation Instruction P A 1...
Page 36: ...Operation Instruction P A 1...
Page 41: ...Operation Instruction 0 G 1 1 1 2 2 Pushbutton Settings...
Page 42: ...Operation Instruction 0 G 1 1 2 Starting the Engine 1 3 Selecting the Gear...
Page 43: ...Operation Instruction 0 G 1 1 4 Setting Off 1 5 Driving Ranges...
Page 44: ...Operation Instruction 0 G 1 1 5 1 Downhill Travel 1 5 2 Downhill Travel 1 5 3 Kickdown...
Page 46: ...Operation Instruction 0 G 1 1 6 Stopping Parking...
Page 51: ...Operation Instruction 0 G 1 1 11 1 Limp Home Mode 1 12 Auxiliary Control Unit...
Page 52: ...Operation Instruction 0 G 1 1 12 1 Operating Instructions for the Auxiliary Control Unit...
Page 53: ...Operation Instruction 0 AB 1 WABCO ABS BASIC INTRODUCTION...
Page 54: ...Operation Instruction 0 AB 1...
Page 55: ...Operation Instruction 0 AB 1...
Page 56: ...Operation Instruction 0 AB 1...
Page 57: ...Operation Instruction 0 AB 1...
Page 58: ...Operation Instruction 0 EC 1 ECAS System Introduction 1 System introduction...
Page 59: ...Operation Instruction 0 EC 1 3 System function...
Page 60: ...Operation Instruction 0 EC 1...
Page 77: ...Operation Instruction 0 E 1 CAN bus module...
Page 158: ...Appendix A 4 Air braking schematic diagram...
Page 159: ...A 5 Electric schematic diagram of the complete vehicle 1...
Page 160: ...A 6 Electric schematic diagram of the complete vehicle 2...
Page 161: ...A 7 Electric schematic diagram of the complete vehicle 3...
Page 162: ...A 8 Electric schematic diagram of the complete vehicle 4...