3.4.1 Please operate this product according to the “recommended installati-
on diagram”.
3.4.2 Correct installation could guarantee the performance of the products.
3.4.3 After the installation ,the motor should be above the limit switch at any
position of the rolling.
3.4.4 After the installation, the cable should be connect into the control box,
then turn on the power, adjust the limit switch the proper position, and
then fasten the lock bolts.
3.4.5 If there is power failure during the operation of the products, and you
would like to lower down the rolling pipe urgently,you could hold the
pipe first and loosen the connection between the pipe and the motor,
then lower the pipe slowly.
3.5 Installation dimension
5
6
3.4 Installation illustration
Push open mechanism
(Another purchase)
Electrical roll-up
Film support
(Another purchase)
Film rod
(Another purchase)
Guiding pipe
(Another purchase)
Electrical roll-up
Fixed support
(Another purchase)
side vent
roof vent
411
6.5
56
14
28
35
122
339
64
10.5
54
15
22
150
11
7
197
4-
8.5
35
97
130