background image

3.4.1 Please operate this product according to the “recommended installati-
         on diagram”.

3.4.2 Correct installation could guarantee the performance of the products.
3.4.3 After the installation ,the motor should be above the limit switch at any
         position of the rolling.
3.4.4 After the installation, the cable should be connect into the control box, 
        then turn on the power, adjust the limit switch the proper position, and 
        then fasten the lock bolts.
3.4.5 If there is power failure during the operation of the products, and you
         would like to lower down the rolling pipe urgently,you could hold the 
         pipe first and loosen the connection between the pipe and the motor, 
         then lower the pipe slowly.

3.5 Installation dimension

5

6

3.4 Installation illustration

Push open mechanism
(Another purchase)

Electrical roll-up

         Film support
(Another purchase)

         Film rod
(Another purchase)

Guiding pipe
(Another purchase)

Electrical roll-up

Fixed support
(Another purchase)

side vent

roof vent

411

6.5

56

14

28

35

122

339

64

10.5

54

15

22

150

11

7

197

4-

8.5

35

97

130

Summary of Contents for GMD300-S

Page 1: ...se Acacemy of Agricultural Sciences No 12 SouthStreet Zhongguancun Haidian Beijing 100081 China Zip 100081 Tel 86 10 62149667 Fax 86 10 82108614 Website www bflc com cn Vension GMD300 S EN01 This product has ben tested and proved to be qualified for delivery Inspected by Inspection date Certificate of quality ...

Page 2: ...ith high R D investment supplying equipments ranging from modern greenhouses to livestock houses Feng long has been leading the trends of mecho electro products in Chinese facility agriculture Fenglong established and follows strict quality control and follow up systems Fenglong obtains ISO9001 ISO14001 and OHSA18001 certificates ensuring all the products are qualified with possibility to track do...

Page 3: ...ICATE OF PRODUCT QUALITY Dear Customer Our company have obtained ISO 9001 certificate The Kingzo electric film rellers are all inspected and each parameter is followed according tou our company electric film reelers standards We herely certify that when the film reeler is correctly installed the guara ntee period of the products is 3 years from the time of purchase Products with quality problem wi...

Page 4: ...se check and fasten the bolts connecting the electric film reeler and its accessories loose bolts will cause danger 1 7 If the product didn t work please don t uninstall the part inside you should stop operating and contact the distributors or the company 1 8 Please don t put the product into water and store it in moist environ ment the product could be damaged or cause danger to operators If the ...

Page 5: ...component transitional connecting sleeve opening sleeve hexagon bolt M10X25 self locking nut hexagon nut M8 hexagon bolt M10X60 hexagon bolt M10X50 hexagon bolt M8X35 Roof open part Assemble Other standards 2 2 Product features performance date 2 1 Product features This product is compact and performances well It is easy to installation and operate The range limit is adjustable It has reverse self...

Page 6: ... the lock bolt by a cross head screw driver 4 2 6 The above steps would set up the motor s limit range Turnon the power and check if the range setup is correct If it is not correct please review the manual carefully and do the setup again 5 Maintenance 5 1 Check the bolts on each connection regularly Replace the bolts which is deformed or snapped 5 2 No need to refill the gear oil during the life ...

Page 7: ...f power shock Left gear pin Left lock bolt Left knob Right gear pin Right lock bolt Right knob Micro switch 3 Installation instructions 3 1 First please fasten the pipe and this product with the bolts Then fix the film into the pipe by the film hoop please keep the pipe and the output shaft of this product on the same line then start the motor and operate the opening and closing the films 3 2 Two ...

Page 8: ...then fasten the lock bolts 3 4 5 If there is power failure during the operation of the products and you would like to lower down the rolling pipe urgently you could hold the pipe first and loosen the connection between the pipe and the motor then lower the pipe slowly 3 5 Installation dimension 5 6 3 4 Installation illustration Push open mechanism Another purchase Electrical roll up Film support A...

Reviews: