Installation and initial operation
01.04.2020
31
3. Seal the
Ped
connection with the screw plug.
4. Connect the pressure reduction valve with the main control block via the
A
connection.
5. Connect the pressure reduction valve with the oil tank via the
T
connection.
6. Connect the pressure reduction valve with the pump via the
P
connection.
4.1.6.
Connecting the excavator control system
The control system can exchange data with various other excavator control
systems, such as Leica or Trimble for example. In doing so, the rotation angle of
the tiltrotator is transferred and displayed by the excavator control system.
Prerequisites:
•
Optional rotation sensor kit is installed in the tiltorator.
•
The CAN bus of the terminal is connected to the CAN bus of the excavator
control system.
1. Remove the sealing plugs from the M12 receptacles on the rear side of the
terminal.
2. Connect the excavator control system.