6
6
-
3-POINT HITcH IMPLEMENT OPERATION
(1) Top Link
(2) Pin
(3) Retainer Pin
(4) Top Link Hook
1. Install the top link to the desired
position, and install the pin and re-
tainer pin.
2. Fix Top link with fixed nut after ad
-
justing top link.
tb3O603A
ADjUsTMENT Of TOP LINK
stop the engine and lower the
attachment to the ground prior
to disconnecting the lift rod
from the lower link. Check that
the attachment has proper
support and that there’s pres-
sure remaining in the hydrau-
lic system to remove the lift
rod holding the pin. To elimi-
nate the remaining pressure,
move the hydraulic adjusting
lever back and forth several
times.
WARNINg
When there is no implement at-
tached, fix the lower link to the
check link (LH/RH) so that it does
not contact with the rear wheel.
Secure the top link to the stor-
age hook.
NOTE
tb3O604A
ADjUsTMENT Of sTABILIzER
(1) check Link
(2) Turnbuckle
1. Adjust the check link control hori-
zontal sway of the implement. It is
also used to set the implement on
the back of the tractor in center.
2. To adjust the check link, pull out
the pin and adjust it until the de-
sired transverse moving distance
is obtained.
3. Fit the pin to the fixed hole for nor
-
mal operation and long hole (mov-
ing) for draft work.
CS2220H(S),CS2520H(S)-미국향-06.ind7 7
2020-03-31 오후 4:51:50
Summary of Contents for CS2220H
Page 40: ...memo MEMO CS2220H S CS2520H S 01 ind30 30 2020 03 31 4 20 46...
Page 46: ...memo MEMO CS2220H S CS2520H S 02 ind6 6 2020 03 31 4 22 45...
Page 88: ...MeMO MEMO CS2220H S CS2520H S 04 ind32 32 2020 03 31 4 23 46...
Page 114: ...mEmo MEMO CS2220H S CS2520H S 05 ind26 26 2020 03 31 4 46 10...
Page 172: ...memo MEMO CS2220H S CS2520H S 07 ind40 40 2020 03 31 4 52 35...
Page 183: ...10 INDEX INDEX 10 2 10 CS2220H S CS2520H S 10 ind1 1 2020 03 24 3 44 39...
Page 190: ...7 CS2220H S CS2520H S 10 ind8 8 2020 03 24 3 44 39...