56
6
-
5
3-point hitch implement And loAder operAtion
(1) top link
(2) set pin
(3) lynch pin
(4) top link hook
1. install the top link to the desired
hole, install the set pin and lynch
pin securely.
2. tighten the lock nut on the top link
securely after adjusting top link
length.
1. Adjust the check chain to control
horizontal sway of the implement.
it is also used to set the implement
on the back of the tractor in center.
2. to adjust the check chain, pull out
the turn buckle and adjust it until
the desired transverse moving dis-
tance is obtained.
td2O527A
td2O601A
td2O529A
ADjusTMENT Of TOP LINk
ADjusTMENT Of CHECk LINk
(1) check chain
(2) turn buckle
(3) set pin
(1) lift rod
(2) turn buckle
(3) lock nut
1. Adjust the implement balance by
turning the lift rod turn buckle.
2. After adjustment, secure it with the
lock nut.
ADjusTMENT Of LIfT ROD
TD210-호주향-DK4810,5310,5810(HS)-05 5
2018-09-07 오전 10:37:09
Summary of Contents for DK4810
Page 33: ...1 1 23 SAFETY PRECAUTIONS td2o103a TD210 DK4810 5310 5810 HS 023 23 2018 05 04 4 35 56...
Page 38: ...MEMO MEMO TD210 DK4810 5310 5810 HS 028 28 2018 05 04 4 36 01...
Page 142: ...MEMO memo TD210 DK4810 5310 5810 HS 016 16 2018 09 07 10 37 20...
Page 184: ...MEMO memo TD210 DK4810 5310 5810 HS 042 42 2018 09 07 10 38 02...
Page 195: ...10 10 INDEX INDEX 10 2 TD210 DK4810 5310 5810 HS 11 1 2018 09 07 2 35 39...
Page 202: ...MEMO memo TD210 DK4810 5310 5810 HS 18 8 2018 09 07 2 35 39...