background image

InstallatIon and InstructIon manual 

FRESH watER Station

  

1

E & OE, subject to change without notice.

Installation and Instruction manual

FRESH WATER STATION 

EN

October 2015

FWS 20 E   

FWS 30 E

FWS 35 E   

FWS WP E

Tank- and Wall fastening

Summary of Contents for FWS 20 E

Page 1: ...nd Instruction manual FRESH water station 1 E OE subject to change without notice Installation and Instruction manual FRESH WATER STATION EN October 2015 FWS 20 E FWS 30 E FWS 35 E FWS WP E Tank and W...

Page 2: ...r tank 7 Wall fastening 8 Hydraulic installation 9 Circulation unit optional 9 Design of circulation unit 9 Installation of circulation unit 10 Electrical connection of circulation unit 10 Operating m...

Page 3: ...ed or unacquainted persons may operate the device only under the supervision or at a trained person s disposition Replacements or repairing of electrical parts like the power cord must be conducted by...

Page 4: ...person and device Additional buzzwords describe nature and severity of the danger Advices are marked with an information sign as illustrated on the left Advices highlight important information for si...

Page 5: ...l limitations of the device Noncompliance with these values leads inevitably to a loss of guarantee For operating the Fresh Water Station the following specific values have to be adhered Dissolved mat...

Page 6: ...20 E FWS 30 E FWS 35 E FWS WP E Output l min 20 30 35 30 Heat exchanger plates 21 29 41 49 Weight kg 15 17 19 21 Charge pump Voltage V Hz 230 V 50 Hz Rotation speed U min 800 4660 Power input W 3 45 N...

Page 7: ...ts and connections of the device Regulation The Fresh Water Station includes a self sufficient regulation An additional external regulation is not intended and not allowed Installation on buffer tank...

Page 8: ...nge without notice 5 Final assembly of shaped connection set Wall fastening Drilling plan for wall fastening on page 14 max 70 Nm 5 Schnitt A A M1 3 A 12 12 12 80 min 60 90 10 M 360 max 70 Nm 20 A 1 2...

Page 9: ...amage The tap water supply needs to be constructed according to specification Picture below 9 13 14 10 15 16 14 K 17 Specification of tap water supply 9 Expansion vessel optional 10 Manometer 13 Secur...

Page 10: ...e circulation circuit A rinsing port needs to be installed in the circulation circuit Electrical connection of circulation unit Danger to life Manipulation of electrical parts must be conducted by a p...

Page 11: ...d circulation The circulation unit is activated by a short actuation of a hot water tapping point Set operation mode selector C to ON Connector assignment time dependent circulation Time dependent cir...

Page 12: ...needs to be checked for function and leak tightness Malfunctions Prior to malfunction diagnostics make sure that the following parameters are met Suffi cient fl ow temperature minimum 55 C at maximum...

Page 13: ...ff valves Remove Flow Switch Check the outlet L of the charge pump with a voltage detector for voltage If there is no voltage when operatng the flow swith change the PCB Wrong hot tapping water temper...

Page 14: ...14 E OE subject to change without notice Drilling plan for wall fastening 800 360 5 43 5 200 400...

Page 15: ...r tank A B C D F E H G Fresh water station A Feed fresh water station hot B Return fresh water station cold Heating circuit group C Return heating circuit low temp cold D Feed heating circuit low temp...

Page 16: ...on return optional E Tap water supply A B C D 4 E 1 2 3 5 35 kPa 5 25 kPa Advices Die domestic hot water DHW temperature is dependent from the buffer temperature the tapping quantity and the cold wate...

Page 17: ...Installation and Instruction manual FRESH water station 17 E OE subject to change without notice Notes...

Page 18: ...18 E OE subject to change without notice Notes...

Page 19: ...Installation and Instruction manual FRESH water station 19 E OE subject to change without notice Notes...

Page 20: ...20 E OE subject to change without notice Contact Art nr 20000071...

Reviews: