Maintenance Schedule; (for trailer mounted vertical mixer)
, con’t
NOTE: It is suggested to make copies of this “Maintenance Schedule” form to assist with
performing routine maintenance inspection of the equipment. This will also serve as a
retention record of all safety and maintenance inspections.
4 check hay brake operations
cross conveyor
1 check for wear on chain assembly
2 check for wear on flooring
3 check drive system
4 check conveyor take-ups and adjust if needed
5 check operations of cross conveyor slide
two speed gear box
1 check yokes for tightness, (check set screws)
2 check oil levels, fill if needed (after pulling sample)
3 check shift pressures & record (where applicable)
4 check shift linkage adjustment & tighten (where applicable)
5 check tightness of gearbox mounting bolts
PTO
1 check and grease shaft, (check set screws & locking collar)
4. WEIGH SYSTEM
minor areas
item
description
check-off
follow-up
required
(y/n)
general
1 check operations of scales
2 check for rotation of load ceils
3 check for damaged wiring
.
4 check and clean load ceil mounting "V" brackets
5 check local support/truck frames for cracks
6 check to see if load cells are loose (i.e. not carrying the load)
5. TEST MIXER'S OPERATIONS
minor areas
item
description
check-off
follow-up
required
(y/n)
general
1 "run-in" mixer for a period of time (15min+) to insure smooth
operations. Walk around equipment and inspect all
components for smooth operations
ADDITIONAL NOTES AND COMMENTS:
AFTER SERVICE IS COMPLETED; WRITE SERVICED DATE WITH YOUR INITIALS ON A STICKER AND
PLACE ON UNIT NEXT TO SERIAL NUMBER ID PLATE.
Summary of Contents for LP1000
Page 76: ...NOTE UNIT SERIAL NEEDED FOR ALL PART ORDERS ...
Page 77: ...NOTE UNIT SERIAL NEEDED FOR ALL PART ORDERS ...
Page 88: ......
Page 89: ......
Page 90: ......