VI-MMXII
Page 37
Maintenance Schedule; (for truck mounted vertical mixer)
Maintenance Schedule
equipment: vertical mixer (truck mount)
frequency: 100 hours;
approximately 1 week intervals;
(
UNLESS STATED OTHERWISE BELOW
)
Customer
___________________________ Location
__________________
Date service performed Hours on truck
___________________________ Hours on unit
__________________
Equipment ser. no.
___________________________ Service technician __________________
MAJOR AREAS
1. CUSTOMER INFO.
minor areas
item
description
check-off
follow-up
required
(y/n)
general
1 speak with equipment operators
2 speak with maintenance technicians
2. HYDRAULIC SYSTEM
minor areas
item
description
check-off
follow-up
required
(y/n)
general
1 check for leaks; (hoses, fittings, seals, etc)
2 pull and identify oil samples,
(every 500 hrs )
3 check oil levels, fill if needed
4 change all oil filters,
(every 500 hrs )
5 change hydraulic oil,
(every 4000 hrs.; approx. 1 year)
6 check pressure bypass (relief) settings & record
7 check for worn hoses
8 start mixer and listen for unusual noises
9 start mixer and check general operating parameters
10 check driveline to pumps;
(lubricate yokes every 8 hrs)
( a needle lube gun fitting is needed)
11 check operations of hydraulic actuators
12 check and record pressures on pump (w/ load & w/o load)
13 check and record pressures on motor (w/ load & w/o load)
14 clean heat exchanger (radiator) on hydraulic system
(daily)
3. MECHANICAL SYSTEM
minor areas
item
description
check-off
follow-up
required
(y/n)
general
1 are all guards in place, (notify customer if not)
2 start mixer and listen for unusual noises
3 look for worn/broken parts
4 lubricate all grease zert fittings and/or points of lubrication
planetary gearbox
1
check oil levels
(daily)
, fill if needed;
(pull oil sample and
change oil every 1000 hrs, 1st oil change at 50 hrs)
2 if applicable, identify oil samples; (send out for testing)
3 is oil clear
4
grease top bearing every 140 hours
Summary of Contents for LP1000
Page 76: ...NOTE UNIT SERIAL NEEDED FOR ALL PART ORDERS ...
Page 77: ...NOTE UNIT SERIAL NEEDED FOR ALL PART ORDERS ...
Page 88: ......
Page 89: ......
Page 90: ......