JOINT FLANGE
TIGHTENING TORQUES AND SEQUENCE
Stud and Nut use in this main joint flange of UP pumps should be tightened to the
torques stated in table 1 and in the sequence stated in Fig.
STUD SIZE
TIGHTENING TORQUES
M12
M16
M20
M24
250Kg-CM
650Kg-CM
1270Kg-CM
2200Kg-CM
2.
Tightening sequence.
2.1 Tighten the four corner stud marked ‘X’ 1, 2, 3, and 4
2.2 Work outward along shaft axis towards the stuffing boxes in opposite quarters
tightening nut in regions 5, 6, 7 and 8.
2.3
Work outwards along the branch and in opposite quarters tightening nuts in regions
9, 10, 11, and 12.
2.4 Repeat the whole sequence.
Sleeve Location
Summary of Contents for 8 UP 200/38
Page 2: ......
Page 16: ...IOM UP_METRIC Issue Date 31 12 2007 Page 16 of 66 Last Revision 12 06 2012...
Page 20: ...IOM UP_METRIC Issue Date 31 12 2007 Page 20 of 66 Last Revision 12 06 2012...
Page 42: ...IOM UP_METRIC Issue Date 31 12 2007 Page 42 of 66 Last Revision 12 06 2012...
Page 53: ...IOM UP_METRIC Issue Date 31 12 2007 Page 53 of 66 Last Revision 12 06 2012 10 0 EXPLODED VIEW...
Page 54: ...IOM UP_METRIC Issue Date 31 12 2007 Page 54 of 66 Last Revision 12 06 2012...
Page 55: ...IOM UP_METRIC Issue Date 31 12 2007 Page 55 of 66 Last Revision 12 06 2012...
Page 56: ...IOM UP_METRIC Issue Date 31 12 2007 Page 56 of 66 Last Revision 12 06 2012...
Page 57: ...IOM UP_METRIC Issue Date 31 12 2007 Page 57 of 66 Last Revision 12 06 2012...
Page 58: ...IOM UP_METRIC Issue Date 31 12 2007 Page 58 of 66 Last Revision 12 06 2012...
Page 59: ...IOM UP_METRIC Issue Date 31 12 2007 Page 59 of 66 Last Revision 12 06 2012...