5
Set-up, installation and connection
5.1 Setting up the unit
When setting up the unit, observe the following set-up conditions:
n
Select a dry and well ventilated set-up location.
n
Do not set up the unit next to heat sources.
n
Avoid direct sunlight.
n
Set up the unit on a firm, level surface.
n
Compensate for uneven ground with adjustable feet.
n
Do not cover, block or line the ventilation grille.
n
Do not cover, block or line the cooling machine.
n
Maintain a minimum distance of 2 cm between wall and unit (for
example by means of a spacer).
n
Maintain a minimum distance of 2 cm between units.
n
Comply with the minimum available space at the set-up location
in order to avoid a potentially explosive as defined in DIN
EN378-1 for the use of refrigerators and freezers with combus-
tible refrigerants (R600a, R290a).
The basis for calculating the minimum available
space at the set-up location is the largest fill quan-
tity of refrigerant in the existing or planned refriger-
ators. For the respective fill quantity of refrigerant,
R600a: volume = refrigerant fill quantity / 8.6 g/m³
R290a: volume = refrigerant fill quantity / 7.6 g/m³
5.2 Installing the unit
BL 100 PRO-ACTIVE
Have the unit installed only by staff qualified for the task. If in
“Manufacturer’s address” on page 4
Install the unit as shown in the installation drawing provided.
5.3 Connecting the unit
The unit is designed according to protection class I
and protection type IP 20 and is ready to be
plugged in.
Set-up
Overview of units suitable for
installation
Installing
Connecting
Set-up, installation and connection
Connecting the unit
26.05.2021
Refrigerator/freezer BL series
40