12
INSTALLATION
INSTALLATION
■
Drill the pilot hole using a
3
∕
32
" drill bit and attach the bracket using the screw provided.
IMPORTANT:
Do not over tighten the screw.
STEP 4 — Install the Bracket Cover
■
Slide the bracket cover over the magnetic hold-down bracket and mark the screw hole.
■
Remove the bracket cover once the screw hole is marked.
■
Drill the pilot hole using a
3
∕
32
" drill bit and slide the bracket cover back over the magnetic hold-down bracket.
■
Attach the cover using the screw provided.
IMPORTANT:
Do not over tighten the screw.
STEP 5 — Place and Attach Second Bracket
■
Repeat steps 1 through 4 to install the second magnetic hold-down bracket.
IMPORTANT:
Make sure the bottom rail is level when marking the second bracket location.
STEP 6 — Final Adjustments
■
Verify that the bottom rail is level.
Summary of Contents for Cellular Shade Automation III
Page 22: ...21 INSTALLATION CHILD SAFETY...