KisanKraft
®
AGRICULTURAL INTER-CULTIVATOR
KK-IC-410P
This warranty is null & void, if you fail to register the warranty with KisanKraft
by sending the KisanKraft Copy with dealer’s stamp
. KisanKraft Limited
: +91.80. 6835 7800
Page 21 of 52
MAINTENANCE & SERVICE
During the working period of the Inter-cultivator, due to the changing running speeds, abrasion
and varying loads, phenomena of bolts loosening and parts wearing are inevitable which in turn
may lead to the malfunction of the system, abnormalities of clearances, declination of engine
power, more oil consumption, malfunction of each part, more failures of the machine, and the
problems affect the normal use of the Inter-cultivator. To reduce chances of troubles, it is better
to do a strict and regular maintenance job which emphasizes precautionary measures to keep
a good performance and extend
the machine’s working life.
1. Running-in ofintercultivator
If cultivator is new or just repaired, it should work without load for one hour. After the mini
cultivator works with light load for five hours, all oil in gear box and crankcase should be drained
immediately. Afterwards, you should refuel clean oil adequately, run the mini cultivator at idle
speed for 3 to 5 minutes to wash it, then drain oil completely. Please refuel oil and carry out
running-in for 4 hours according to the procedure given earlier. By doing so, the cultivator will
be ready to work in normal condition.
2. Technical maintenance ofintercultivator
2.1 Per shift maintenance (before and after work):
1)
Hear and check if there is malfunction for every part (such as abnormal noise,
overheat, loose screw).
2)
Check if there is oil leakage from the engine, gear box and running gear.
3)
Check if the oil level is in dipstick scale.
4)
Clean the mud, grass, and oil stain regularly.
5)
Keep daily record.
2.2 Primary maintenance (per 150 hours)
1)
Carry out all maintenance works of per shift.
2)
Wash gearbox and change lube oil.
3)
Check and adjust clutch unit, shift unit and reverse gear unit.
2.3 Secondary maintenance (per 800 hours)
1)
Carry out all maintenance works per 150 working hours.
2)
Check all gears and bearings. If they are fretted severely, please replace them.
3)
Check other parts, such as rotary blades or bolts. If there is damage, please replace
them.
2.4 Technical inspection (per 1500-2000 hours)
1)
Disassemble, clear, or check the whole machine in the specific maintenance station.
If the accessories are severely fretted, they must be changed or repaired.
2)
Ask experts to check the friction plate and clutch.