9
Install Duct Covers
NOTE: Remove the film from the duct covers.
1. Assemble the upper duct covers together and install the duct
covers around the support frame. The larger hole in the
flanges of the upper duct cover must be outside the smaller
hole in the mating flange of the other upper duct cover.
2. Secure the upper duct covers together with two 3.5 x 6.5 mm
screws at the top and two 2.9 x 3 mm screws at the bottom.
Install 1 screw on each side at the top and bottom of the
assembled duct covers.
NOTE: For non-vented (recirculating) installation, the slotted
holes in the upper duct covers will be visible when assembled.
For vented installations, the slotted holes will be hidden down
inside the lower duct covers.
3. Slide the upper duct covers up the frame to the ceiling and
secure to the upper horizontal support with 2 - 3.5 x 6.5 mm
screws.
4. Place the long end of the plastic clips (2) into the bottom of
the front lower duct cover.
5. Install the lower duct cover (front) to the range hood canopy.
Spread the lower duct cover opening slightly and position it
over the upper duct cover. Set the lower duct cover in place.
Position so the flanges of the lower duct cover set into the
flanges of the upper duct covers.
A. 3.5 x 6.5 mm screws (2)
B. Assembly holes (larger hole outside of
smaller hole on both sides)
C. 2.9 x 3 mm screws (2)
A. Top toward ceiling
B. Slots installed up for non-vented installations
C. Slots installed down for vented installations
A
A
B
C
C
A
B
C
A. 3.5 x 6.5 mm screw
B. Slotted holes (2)
C. Upper duct covers
D. Ceiling
A. Lower duct cover - (front)
B. Plastic clips (2) (long end for front placement)
A. Range hood canopy
B. Plastic clips
C. Lower duct covers
D. Upper duct covers
B
C
A
D
B
A
A
B
D
C