5a
4
4
1
6
1 : Blade
4 : M4x12mm
5 : M4x25mm
6 : Main pulley
5b
6.2 Assembly
6.2.a Setting up the wind
turbine
Blades fixation
•
Remove the butterfly screws (4 and
5a) from the blades.
•
Partially unscrew the butterfly
screws (5b) from the pulley (6).
•
Insert the blades (1).
•
Put back all the screws (4 and 5)
being careful with the lengths (screw
4 is the smallest).
•
Tighten properly by hand (do not use
any tool).
12
User Manual KiweeOne
IMPORTANT : Be careful to
insert the blades in the
right direction. Refer to the
engraving on the aluminum
plate.
Vane fixation
•
Unscrew the butterfly nut (20).
•
Insert the upper tube (21a).
•
Insert the vane (8) on the hexagonal
column nut (14). The vane must be in
the same plane as the rope belt
pulley.
•
Screw the butterfly nut (20).
•
Insert the lower tube (21b).
IMPORTANT : Pay attention
to untangle the tensioner
(33) of the fin (32) and to
not cross them when
assembling the tubes.
8
20
21a
21b
14
8 : Vane
14 : M8 Hexagonal column nut
16 : rope belt pulley
20 : M8 butterfly nut
21 : Ø8mm tubes
ADVICE : The upper tube
(21a) is the one with a
twisted screw at its end.