35
7)
While pulling on the wire, SLOWLY operate hoist in the DOWN direction to thread the load chain
over the load sheave. Make sure the chain feeds smoothly while operating the hoist. If binding
occurs, stop and SLOWLY operate the hoist in the up direction to the back the chain out, then
reorient the load sheave as instructed in step 5 before attempting to reinsert the load chain.
8)
Operated the hoist in the down direction until sufficient there is sufficient load chain to reeve the
hoist.
9)
Reeve the chain through the bottom hook assembly. Remove the wire from the Load chain and
attach the no-load and load end of the load chain to the hoist. Ensure that chain remains free of
twists.
10)
After installation has been completed, perform steps outlined in Section 3.12 "Preoperational
Checks and Trial Operation".
10 Ton TCR10000P2 & TCR10000C2
25 Ton TCR25000P2 & TCR25000C2
Figure 7-3
Diagram showing chain replacement
Summary of Contents for Harrington TCR
Page 11: ...11 Figure 2 2 Hoist Part Identification Diagrams 25 Ton TCR25000P2 and TCR25000C2...
Page 42: ...42 NOTES...
Page 43: ...43 NOTES...
Page 46: ...2 of 10 TCR10000...
Page 50: ...6 of 10 TCR25000...