11
EN
SCOPE OF DELIVERY
The following fixing material is included in the scope of delivery:
• Brackets (2 pcs.)
• Metal rods (2 pcs.)
• Plastic bushings (2 pcs.)
• End caps (2 pcs.)
• L-bolts (2 pcs.)
• Hardware (lag screws, dowels, washers)
INSTALLATION
1
Slide the plastic bushings into the left and right bracket.