JL-JK-OBA
Installation and Operation Manual
PG 27/35
REV: A (1/21/2019)
10.1.7.
Install JK-203 Frame Strap over front cross member and align with JK-201, as shown in Figure 7 below;
install
to point “
D
”
, as shown in
. Use #2, #13, and #19 and
attach to point “
E
”
. Hand tighten.
10.1.8.
With all fasteners hand tight, make any necessary final adjustment to position of JK201 Tank Bracket
then final tighten all fasteners, using below method.
Figure 11 - JK-201 & JK-203 Mounting Strap Install over Crossmember
10.1.9.
Firmly tighten all fasteners in following order; reference
1.
Tigh
ten hardware “E” to 11
-13 ft-lbs
2.
Tighten hardware “D” to 18
-21 ft-lbs
3.
Tighten QTY (2) M8 bolts “A” connecting Evaporative Canister to 15
-20 ft-lbs
4.
Tighten hardware “B” to 18
-21 ft-lbs
5.
Tighten hardware “C” to 18
-21 ft-lbs
Insert Mounting Strap over
Crossmember near driveshaft
and slide outward into place
D
E
FRONT