background image

 

OPERATION AND MAINTENANCE MANUAL 

DTR MCK v.2.4 

PAGE 

GDYNIA 

MODULAR AIR HANDLING UNITS   

MCKS, MCKH, MCKP

 

 

2017 EN 

39/45 

 

 

KLIMOR Spółka z ograniczon

ą

 odpowiedzialno

ś

ci

ą

 Sp.k., 81-035 Gdynia, ul. B. Krzywoustego 5 

Fax: (+48 58) 783-98-88; Tel.: (+48 58) 783-99-99  
Service -

 

Fax: (+48 58) 783-98-88; Tel.: (+48 58) 783-99-50/51 Mobile: (+48) 510 098 081 

Information in this document is subject to change 

email: 

klimor@klimor.pl

 -

 

office 

serwis@klimor.pl

 

-

 

service 

 

e) 

The supply for DX coolers is allowed only when air flows through the device. 

Opening supply of the cooling medium to the cooler with no heating load can lead to the compressor dam-
age. 
 
f) 

In case of floor AHUs with dampers in external version it is necessary to apply actuators with higher protection 
class, at least IP54.

 

g) 

The AHU control system should enable turning off the device when the local fire protection system is triggered. 

 

 

10.  MCK AHUS IN EXTERNAL VERSION 

The MCK AHUs can be adapted to operation in external conditions. 
Below you can find the specification of differences between the AHU in roof version and standard version: 
 

A. Casing 

All gaps between fixed panels, such as covers, and the aluminum framework are filled with sealing silicone.  

 
B. Air intake/air exhaust 

Air  intake/air  exhaust  are  constructed  as  a  ventilation  profile  with  mesh  and  guides.  Its  role  is  to  protect  the  air  in-
let/outlet  against  rain,  wind  and  particles  larger  than  10×10 mm.  It is screwed  to  the damper  or  AHU's  profiles.  As-
sembly on the front or other wall (np. side wall) once the AHU is equipped with an empty section. It is possible to in-
stall additional elbows or sections. 
 

C. Dampers 

Cut  off  dampers  are  installed  outside  the  AHU.  Such  placement  is  possible  thanks  to  hiding  the  drive  blades  in  a 
double  aluminum  profile.  The  damper  actuators  are  covered  with  a  membrane  but  it  is  necessary  to  use  actuators 
characterized by higher protection level, at least IP54.

 

 

D. Exchangers 

Water exchangers (heaters) are equipped with anti-frost protection as the anti-frost thermostat (available only with the 
provided complete control system). Connectors of the heaters manifolds can be located inside the AHU to enable in-
stallation  of  supply  and  return  pipelines,  through  the  ceiling  in  a space  between  the  AHU  frame or  inside.  It is also 
possible to install the exchanger's control node in an additional section.  
 

E. Roofing 

Each set is equipped with a roofing made of galvanized or coated sheet fixed to the AHU frame profile. 
The roofing elements set is provided at a separate pallet. 
The roofing assembly is carried out once the AHU is located in the destination. 
 

F. Automation control system 

The  control  system  provided  is  available  in  external  or  internal 
version. 
The  external  control  system  switchboard  with  IP65  rating  is 
equipped with the heater and thermostat.  
Inverters to be installed inside the AHU in the fan section 
See the AHU control system OMM to find more info. 
 

  

 

Figure No. 42

 Preferred installation location of the inverter in the fan block

 

 

          

 

Summary of Contents for MCKH

Page 1: ...stego 5 Fax 48 58 783 98 88 Tel 48 58 783 99 99 Service Fax 48 58 783 98 88 Tel 48 58 783 99 50 51 Mobile 48 510 098 081 Information in this document is subject to change email klimor klimor pl office...

Page 2: ...TION OF THE MCKS RX AHU 23 6 2 AHU INSTALLATION AND CONNECTION 24 6 2 1 AIR SYSTEM 24 6 2 2 CONNECTING ELECTROSTATIC FILTERS 25 6 2 3 CONNECTION OF HEATING AND COOLING BLOCKS 25 6 2 4 CONNECTING THE H...

Page 3: ...over all information in relation to the system and supplementary components which should be provided with dedicated operation manuals 2 GENERAL TECHNICAL DESCRIPTION 2 1 Intended application Modular a...

Page 4: ...e MCK AHUs as standard are designated with a short code according to markings shown in the diagram 1 Diagram No 1 Short MCK AHU designation 1 2 3 4 5 TYPE MCKS standard MCKH hygienic MCKP swimming poo...

Page 5: ...Water humidification ES Inspection Mixing Separation MX Mixing Recirculation SL Short silencer Long silencer VF Fan PR Cross flow heat exchanger CPR High performance hybrid exchanger RR Rotary heat ex...

Page 6: ...lled inside the AHU Dismantling opening disassembling or cutting out elements of the supporting structure carried out by the user may lead to the AHU depressurization and loss of warranty The supporti...

Page 7: ...he opposite side Drain traps are also provided and please make sure to install them in accordance with the guidelines listed in the point 6 2 5 All AHU rectangular inlets and outlets are equipped with...

Page 8: ...owed the device may be damaged For AHUs with the heat recovery the heating module sections can be equipped with internal bypass chambers of the heat exchanger with a control damper The side flow is us...

Page 9: ...hen the humidifier was selected Requirements related to the water humidifier installation are provided in section 6 2 4 1 Trickling filter 2 Water distributors 3 Water distributors pipes 4 Float 5 Flo...

Page 10: ...re heated and steam generation proceeds Required steam generator capacity is achieved by setting with the automatics control system an appropriate value of the current passing through the electrodes N...

Page 11: ...re fitted in rails with gaskets and a strip clamp fasten with an eccentric connection mechanism At the filter replacement it is recommended to replace self adhesive gasket attached inside the rail The...

Page 12: ...n 2 302 Min set Hz value FZ min Table No 9 Hz 303 Max set Hz value FZ max Table No 9 Hz 341 Acceleration time in s from min to max preset value 30 s 342 Breaking time in s from min to max preset value...

Page 13: ...ally covered with a layer of hygroscopic material The heat exchanger should be equipped with anti frost system to protect the unit against consequences of extensive chilling of the air exhaust part of...

Page 14: ...m with the circulating pump option Design of the heat exchangers is similar to the Cu Al water coolers and heaters A heat exchanger located in extracted airflow cooler absorbs the heat from the air an...

Page 15: ...8 15 INST GLKL LE_HE 10 PUMP CM10 3 5 50 2 2 2895 8 15 INST GLKL LE_HE 11 PUMP CM15 2 5 50 2 2 2895 8 15 Sets with the glycol system as standard are supplied in empty condition Scope of pipeline assem...

Page 16: ...below shows minimum amounts of air depending on a AHU size and rows numbers of the exchanger which serves as a condenser and cooler Higher rows number is able to accept return a given power at lower a...

Page 17: ...re gauges are equipped with an automatic re set device Additionally there are low and high pressure gauges with automatic reset device in tandem set Once ac tivated they reduce the output in order to...

Page 18: ...he drainage line only in systems with one compressor 9 Four way valve 10 DX container in 160 size systems 11 Ball valve for DX fill up 12 Filter dehydrator 13 Solenoid valve 14 Eyehole 15 Expansion va...

Page 19: ...adjustment valve 8 Check valve at the drainage line 9 Four way valve 10 DX container in 160 size systems 11 Ball valve for DX fill up 12 Filter dehydrator 13 Solenoid valve 14 Eyehole 15 Electronic ex...

Page 20: ...d ensure minimum amounts of air given in Table No 10 The condition of air filters should be monitored Contamination of air filters may cause considerable drops in airflow rate Monitoring the cooling s...

Page 21: ...ipe or hook at tachment and lifting using belts In case of separated air supply exhaust AHUs the upper part is lifted using additional holders which are screwed to lower part of the framework The hold...

Page 22: ...t Sheet thick ness Framework height 01 02 03 Foundation corner 1500 mm 2 mm 120 mm 04 05 Framework made of channel bars 1500 mm 2 mm 120 mm 06 07 08 09 10 11 Framework made of channel bars 1200 mm 2 5...

Page 23: ...nce the sections are connected requires installation of a sealing cover channel bar and sealing with silicone according to Fig No 49 If the sealing cover is not installed it may lead to local condensa...

Page 24: ...can proceed with connection of air ducts electrical power supply heating and cooling ducts as well as humidifying system scope of work depends on the AHU functionality 6 2 1 Air system The AHU with s...

Page 25: ...ring diagram of electrostatic filters 6 2 3 Connection of heating and cooling blocks Water heaters and coolers Exchangers should be connected in such a way as to prevent stresses that may cause mechan...

Page 26: ...h the qualification certificate issued by the manufacturer Please contact Klimor service department or the burner s manufacturer to schedule the start up The following conditions must be met before st...

Page 27: ...opening of the bypass damper if equipped setting the flow defined in the AHU Data Sheet 6 2 4 Connecting the humidification block a water humidifier with a trickling filter 1 Water supply 2 Cut off va...

Page 28: ...re Figure No 29 Connection of water supply and return from the humidifier with an electrical steam generator Requirements 1 It is required to install a cut off valve and mechanical filter not provided...

Page 29: ...t up While connecting motors and other electrical devices and components it is necessary to strictly follow the H S re quirements stated in appropriate standards and regulations related to the install...

Page 30: ...er with their accessories 4 In the water humidifier with the trickling filter it is necessary to check the pomp attachment and operating condition of the float valve its closing operation and level 5...

Page 31: ...start up the AHU only with closed doors of the fan block Take into consideration the instructions stated in section 9 Table No 16 EC fans connection diagram description Fig No 35 No Cable no Intended...

Page 32: ...and motor cleanliness clean if necessary after 12 month period Check cleanliness of heat exchangers and heat recovery exchangers using a vacuum cleaner soft brush or blow with compressed air Check cl...

Page 33: ...in detergents depending on a type of contamination rinsing with clean water and drying Depth of the cartridge filters is 50mm Table No 18 Dimensions and number of cartridge filters in AHUs Size confi...

Page 34: ...Example of bag filters class G4 designation for AHUs size 4 FK 4 300 6k 592x592 1 FK 4 300 6k 592x287 2 FK 4 300 3k 287x287 1 Example of bag filters class F9 designation for AHUs size 8 FK 9 500 8kw 5...

Page 35: ...eater Condition of the heater fins should be checked less frequently every 12 months however it is recommended to do it while replacing the filters When the exchanger is contaminated it should be clea...

Page 36: ...ary exchanger sections the neighboring sections should be secured Clean with a vacuum cleaner with a soft suction nozzle on the side of air inlets or blow through with air in the direction opposite to...

Page 37: ...ing Too low medium evaporation temper ature Rise medium evaporation temperature Escaping cooling medium Leakage at screwed or soldered con nections Locate the leakage and seal it properly 4 Cooling bl...

Page 38: ...lves thermometers and manometers near the devices c In case of heaters it is recommended to apply bypass of the control valve using the 15 pipe with manual control valve or adjustable orifice to allow...

Page 39: ...0 10 mm It is screwed to the damper or AHU s profiles As sembly on the front or other wall np side wall once the AHU is equipped with an empty section It is possible to in stall additional elbows or s...

Page 40: ...e Fax 48 58 783 98 88 Tel 48 58 783 99 50 51 Mobile 48 510 098 081 Information in this document is subject to change email klimor klimor pl office serwis klimor pl service 100 mm 100 mm A A Falownik F...

Page 41: ...eyeholes Inspection eyeholes portholes 200 are located in front covers and panels in sections equipped with illumination They enable without switching off the AHU assessing the contamination degree of...

Page 42: ...aded connectors Connection of these elements should be carried out so that it is possible to remove each exchanger and humidifier from the AHU d Each AHU set is equipped with drip gutter for inter nal...

Page 43: ...ecommended to avoid locating the air intake in vicinity of the air exhaust cooling towers sources of odors or harmful gases as well as streets car parks and areas with external thermal load The design...

Page 44: ...s required for the security designation 12 6 The tray below the heat recovery exchanger is made of stainless steel sheet 12 7 The blades of the exchanger droplet separator are made of PPTV profiles 12...

Page 45: ...dynia ul B Krzywoustego 5 Fax 48 58 783 98 88 Tel 48 58 783 99 99 Service Fax 48 58 783 98 88 Tel 48 58 783 99 50 51 Mobile 48 510 098 081 Information in this document is subject to change email klimo...

Reviews: