background image

Assembly and Repair Instructions 

page 1 of 6 
release 0 

 

Chemoball KH2F-CI 

file:

 Montage-Reparatur-

Anl KH2F-CI_ 
EN-110429.doc 

 

 

Provide: Roth/BNi 

Printed pages will not be updated 

Approval: Roth 

Date:  29.04.2011 

 
Assembly and Repair Instructions for KLINGER SCHÖNEBERG Ball Valves, Type Chemoball KH2F-CI 
 
 
Table of Contents 
 
 

Validity  …………………………………………………..………………………………………………………...… 2 

General Remarks  ……………………………………………….………………………………………………….. 2 

Construction and Components Chemoball KH2F-CI ………………………..…………………………...……... 3 

Assembly of the Chemoball KH2F-CI  ……………..……………………………………………………………... 4 

 

4.1 

Preparing for Assembly …………….………..………………………………………….…………………. 4 

 

4.2 

Assembling the Valve  ……..………………..…………………………………………….……………….. 4 

 4.3 

Function, 

Strength 

and Tightness Test  ……..……….…………..…………………….….……..……… 4 

 

4.4   Independent Conversion and Manufacture of Spare Parts  …………………..…..…………………… 5 

 

4.5 

Incorrect Operation ……………………………..………………………………………………………….. 5 

Dismantling of the Chemoball KH2F-CI…………………………………………………………………………... 5 

 

5.1 

Precautionary Measures  …………..……………………………………………………………………… 5 

 

5.2 

Preparing for Dismantling …………..……………………………………………….…………………….. 5 

 

5.3 

Dismantling  ………..……………………………………………………………………………………….. 5 

 

5.4 

Final Cleaning and Recording of Damage ……………………………………………………….……… 6 

 

Reviews: