10
Installation Instructions
Assembly line room and discharge of combustion fumes.
Make sure that adequate air flow as current prescribed by standards. The oxygen necessary for
combustion is 2 m for 1kW energy (gas).
Installation Area;
Keep the room well-ventilated for sufficient combustion. Air current, the size of the Ventilation opening
has to be 100 cm2 working section for exterior wall to provide air current. If there is no gas safety
system, this section must be at least 200 cm2 Ventilation opening musn't be closed both surface of the
wall. It should be near the floor. Ventilation of the room can be provide by other rooms.
Discharge of combustion fumes:
Use hood fume to discharge of combustion fumes. If hood fume doesn't been used, elecrtical ventilation
system can be alternative.
A: ventilation opening
E: electrical fan
C: hood fume