background image

a

a

a

a

a

a

a

a

f

g

f

g

b

d

d

d

d

d

d

d

d

d

d

e

f

6

1

2

3

4

6

7

7

6

6

6

8

9

10

5

11

6

7

8

9

10

6

6

6

1

2

e

e

e

e

e

e

e

e

e

e

d

e

d

e

g

Step 1:

 Fix   

Part f on the back of board  7  with screws g. Fix board 6 

to boards  7 , 8 , 9 & 10 with screws a (as per below diagram).

Step 2:

 Put Part e in corresponding position (as per below diagram), 

then connect board  1 & 2 , and board  3 & 4  with screw d. Fix the 

screws e with screwdriver and ensure all parts align.

Step 3:

 Place dowel (Part b) into the corresponding position as per 

below diagram. Insert Part e into the holes on board 7 , 8 , 9 & 10 as per

below diagram. Fix the shelves (from step 1), board 5  and the side panels

(from step 2) together with screws d.

Reviews: