Electric motors Size 63 - 225 ATEX / IECEx
Installation and commissioning
2016-05-23
41
Pos : 6. 39 /KN 2006-Pr ojekte/Herf order Elektromot oren-Wer ke/I nst allation & I nbetri ebnahme/ VOR SICHT - Her ausg esc hleudert e Pas sf eder @ 59\ mod_1203079038551_1. doc @ 1034432
CAUTION!
Risk of personal injury and/or material damage
from feather keys ejected at speed.
When commissioning a motor without drive
elements the feather keys may be ejected at
speed.
Therefore:
– Before commissioning motors without drive
elements remove or secure the feather keys
beforehand.
Pos : 6. 40 /KN 2006-SM /nL---------- Abschnitts ende ---------- @ 8\ mod_1141997892953_0.doc @ 75471
Pos : 6. 41 /KN 2006-Pr ojekte/Herf order Elektromot oren-Wer ke/I nst allation & I nbetri ebnahme/ Vor Inbetriebnahme pr üf en @ 59\ mod_1203079708164_1.doc @ 1034523
Before commissioning make sure that:
the minimum insulation resistance values are adhered to
( chapter "Checking the insulation resistance").
the protective earth conductor connection is properly
established and, where necessary, a potential equalisation has
been established (see DIN EN 60079-14, chapter 6.3)
the rotor can be turned without rubbing.
the motor is properly fitted and aligned.
the drive elements have the right settings (e.g. belt tension for
belt drive etc.)
the drives are suitable for the conditions of use.
all electrical connections, fastening screws and fastening
elements are the right type and are tightened properly.
measures to prevent accidental contacts for mowing and live
parts have been taken.
NOTE!
Commissioning is performed using the overall plant
control unit ( Operating manual for the complete
plant).
Pos : 7.1 /KN2006- SM/nL.......... Seitenumbr uc h .......... @ 8\mod_1141998334703_0.doc @ 75489
Summary of Contents for N630 EX
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 144: ...KNF worldwide You can find our local KNF partners at www knf com...