KNIGHT D-SERIES SERVO HOIST OPERATION MANUAL
SECTION 4
MAINTENANCE
28
4.6 Load and Safety Drop Stop Chain Replacement (Normal Maintenance)
The materials required for the chain replacement are shown in Figure 4-7:
Figure 4-7
Step 1. Raise the inline handle to its full up position (Home).
Step 2. Measure the distance from the top of the inline handle to the bottom of the servo
hoist. (Refer to Figure 4-8)
Step 3. Record this measurement because it will be used in section
4.6.1 Resetting the Encoder Offset.
Figure 4-8
Step 4. Move the inline handle down to a comfortable working height.
Step 5. Remove ALL of the load that is attached to the hoist under the inline handle.
This includes the part and the system’s fixture.
Date of Replacement
Measurement
in.
in.
in.
in.
in.