81
11 Accessory change by direct coupling
1. Clean and lubricate the bores.
2. Put the o-rings in place.
3. Align the pin bore with the bucket A bore.
Add shims to compensate for play if necessary.
4. Insert the swivel pin into bore A.
5. Lift the equipment and align the arm bore with the bucket B bore holding the bucket about
5 cm of the ground.
Add shims to compensate for play if necessary.
6. Insert the swivel pin into bore B.
7. Put the bolts in place on axes A and B.
8. Grease the hinged parts.
11.2.1 Loading bucket
IMPORTANT
Protect the various elements from dirt and dust.
Take care not to damage seals on each bushing side.
1 = Arm
2 = Bucket link
[S2PU00027ZE02] [1204CsCshWbYs]
Summary of Contents for SK17SR
Page 2: ...S2PU00027ZE02 1204CsCshWbYs...
Page 4: ...S2PU00027ZE02 1204CsCshWbYs...
Page 6: ...S2PU00027ZE02 1204CsCshWbYs...
Page 8: ...S2PU00027ZE02 1204CsCshWbYs...
Page 10: ...S2PU00027ZE02 1204CsCshWbYs...
Page 18: ...2 S2PU00027ZE02 1204CsCshWbYs...
Page 23: ...3 Warning labels 7 S2PU00027ZE02 1204CsCshWbYs...
Page 52: ...36 S2PU00027ZE02 1204CsCshWbYs...
Page 54: ...38 S2PU00027ZE02 1204CsCshWbYs...
Page 114: ...98 S2PU00027ZE02 1204CsCshWbYs...
Page 138: ...122 S2PU00027ZE02 1204CsCshWbYs...
Page 140: ...124 S2PU00027ZE02 1204CsCshWbYs...
Page 144: ...128 S2PU00027ZE02 1204CsCshWbYs...
Page 146: ...130 S2PU00027ZE02 1204CsCshWbYs...
Page 158: ...142 S2PU00027ZE02 1204CsCshWbYs...