USER MANUAL CENTRAL HEATING BOILER TYPE C38GC25; C38GC25-P; C38GC29; C38GC35; C38GC35-CH1; C38GC35-CH2
REV. 01.07.2019
24 din 37
Figures 1.20 and 1.21 are two examples of displaying temperature in the setting mode.
Figure 1.20 – pressure in the heating installation is 1,8 bar, central heating station is set on winter
mode, set value of thermal temperature is 42°C;
Figure 1.21 – pressure in the heating installation 1,6 bar, central heating station is set on winter mode,
set value of hot water temperature is 60°C.
7
COMMISSIONING
Danger!
Commissioning work is only permitted by the authorized technician.
In order to benefit from all the functions of the boiler for a long time, it is recommended to perform all the works
described below.
Danger!
Danger of death by electric shock to electrical contacts!
7.1
Commissioning work
In commissioning works, the following steps must be taken:
Tab. 7.1 Work steps for commissioning
Nr.
Working Stage
Is made:
At commissioning
1.
Check the air / gas intake / outlet kit connection mode
•
••
•
2.
Measurement of power supply parameters
•
••
•
3.
Checking the boiler connection to the power grid
•
••
•
4.
Check the pressure in the expansion vessel with the membrane
•
••
•
5.
Check the presence of magnetic filter on the return of the installation
•
••
•
6.
Filling and emptying the heating system
•
••
•
7.
Gas supply
•
••
•
8.
Starting the boiler
•
••
•
9.
Adjustment of fuel mixture and quantity
•
••
•
10.
Measurement of static pressure and dynamic gas supply pressure
•
••
•
11.
Maximum power setting on CH and DHW depending on installation
•
••
•
12.
Pump speed adjustment according to installation requirement (factory set at 5m)
•
••
•
13.
Setting additional features
•
••
•
14.
Installation of the room thermostat and outdoor sensor
•
••
•
15.
Check the presence of softener impurities on the domestic hot water inlet circuit
•
••
•
16.
Checking safety features
•
••
•
17.
Exhaust system tightness test
•
••
•
18.
Verification of gas tightness
•
••
•
19.
Shut down the boiler safely
•
••
•
20.
User training
•
••
•
7.2
Starting the boiler and choosing the operating mode:
7.2.1
Starting the boiler (control panel LMC1X and control panel LMC1112)
To turn on the boiler press the POWER key fig. 1.9 or 1.10.
7.2.2
Choosing the functioning modes of the central heating BOILER
Choosing the functioning regime winter/ summer
By pressing
J7
key (
) the functioning regime can be switched from winter to summer or the other way around. This can be
viewed on the display, symbol
S7/S8
will be activated.
Adjusting temperature on the thermal circuit
The adjustment of temperature is done by pressing
J5 (MENU/OK)
and by pressing
J1
(
P-
) or
J2
(
P+
) until symbol S9(
) flashes
and symbol
S1
displays
the temperature of the thermal agent.
To increase/ decrease use keys "
+
" and "
–
".
Adjusting water temperature on the hot water circuit
The adjustment of temperature is done by pressing
J5 (MENU/OK)
and by pressing
J1
(
P-
) or
J2
(
P+
) until symbol
S10
(
) flashes.
To increase/ decrease use keys "
+
" and "
–
".
7.2.3
Functioning as domestic hot water BOILER (DHW)
The BOILER can function as DHW in both seasons – winter and summer.
The DHW request has priority over the heating request in the „winter” mode.
The BOILER can function as instant DHW or as accumulation boiler DHW (the boiler is purchased separately). For the functioning
of the BOILER as an accumulation boiler DHW BOILER please address an authorised service company.
In intant regime, the minimum flow of hot water detected by the BOILER is 2.4 l/min.
For confort in using the BOILER as a DHW BOILER we recommend to exploit the BOILER at a flow of approximately 7-8 l/min.
Fig.1.21