4-6
5E2234
June 2000
Calibration
Calibration Image
IMPORTANT: The 21-step density data on the
Calibration Test Film can be used for process
control.
8.
Measure the 10-step density data by using a
Densitometer.
a.
Prepare the Densitometer for use.
b.
Measure the density at the center of each grey
step on the Calibration Image.
c.
Record the data.
9.
Enter the film densities from the Calibrate Printer
Screen.
21-step
10-step
10
9
8
7
6
1 2
3
4
H178_0038GC
5