Specifications
B-2
September 2000
Site Requirements
Operator and Service Access
When fully assembled the equipment requires a minimum of 91 cm
(36 in.) on each side to allow sufficient access for normal operator maintenance
and for service.
Floor Requirements
The equipment should be installed on a smooth, hard, and level floor surface.
Carpet is not recommended.
The floor pitch should not exceed 1 inch in 5 feet.
Printer
Processor
4.4 meters (174 in.)
2.9 meters
(114 in.)
15A
30A
1.5 meters (60 in.)
.91 meters (36 in.)
minimum
.91 meters (36 in.)
.91 meters (36 in.)
.91 meters (36 in.)
minimum
minimum
minimum
3.5 .3 meters (138 in. + 12 in.)
2.2 .3 meters (86 in. + 12 in.)
_
_
_
_
*
*
SCSI-2 connection from host here
4.5 meters (179 in.)
Summary of Contents for PROFESSIONAL LED II 20P
Page 16: ......
Page 20: ......
Page 74: ......
Page 90: ......
Page 118: ......
Page 122: ......
Page 146: ...Additional Calibration Information C 12 September 2000 Value Graph ...
Page 147: ...Additional Calibration Information September 2000 C 13 Difference Graph ...
Page 168: ......
Page 190: ......
Page 197: ......