Specifications
September 2000
B-3
Plumbing
NOTE: Always adhere to local ordinances and regulations for wastewater disposal.
A plumbed processor with a water wash system is required for environments with
temperatures above 27
o
C (80
o
F).
Plumbed Processors – Water Supply
You are responsible to provide adequate water supply and drainage for the
processor before it is installed.
We recommend that you order a water supply panel for plumbed systems from
Kreonite Inc. The water supply panel must be installed by Kreonite. However, a
Kodak representative will install flexible supply line to the processor and an
electrical connection to the solenoid. The water supply panel should be wall-
mounted within 4.9 m (16 ft.) of the rear of the processor.
Installation, technical support and warranty of the water supply panel is the
responsibility of Kreonite.
Water to a plumbed system must meet the following specifications:
•
Flow Rate:
3.8 – 20.0 liters per minute (1 – 5 gallons per minute)
•
Temperature: Hot – 59
o
C (120
o
F) minimum
Cold – 27
o
C (80
o
F) maximum
Plumbed Processors – Waste Water and Effluents
A 2 inch floor drain should be located near the processor. The drain system
should conform to the local specifications for silver-laden bleach-fix and stabilizer
or waste water.
A Kodak representative will install a flexible drain tube to the processor. You are
responsible for installing the flexible drain tube to a locally approved drain system.
For unplumbed systems,10-litre containers are installed under the processor to
transport waste to the site’s waste facilities.
We recommend that you install a 61 cm (24 in.) wide sink near the processor for
cleanup and processor maintenance.
Unplumbed Processors
We recommend that you install a 61 cm (24 in.) wide sink near the processor for
cleanup and processor maintenance.
Summary of Contents for PROFESSIONAL LED II 20P
Page 16: ......
Page 20: ......
Page 74: ......
Page 90: ......
Page 118: ......
Page 122: ......
Page 146: ...Additional Calibration Information C 12 September 2000 Value Graph ...
Page 147: ...Additional Calibration Information September 2000 C 13 Difference Graph ...
Page 168: ......
Page 190: ......
Page 197: ......